time Email
  • Custom Engineering Request & Risk Assessment

  • Required Required

  • Required Required
    Required

  • System Details / Requirements

  • What is being done inside of the enclosure? What type of material (powder, liquid, gas, nuisance odor) is being worked with? How does the material enter and exit the enclosure system? etc...

  • What type of filtration is required? What is the required Occupational Exposure Limit for the process, or any other details about containment goals? What is the quantity of powder or liquid, task duration, composition of powder?

  • What equipment is being worked with? What is the equipment model, size, scope, function, movement, heat output, etc... *State the specific equipment make and model if available*

  • Is this similar to a TaskMatch enclosure or Standard enclosure? Enter the Enclosure ID or TaskMatch link here.

  • Are there any details on the facility that could affect the design of the enclosure including ceiling height, install door width, installation path, docks, available CFM, shipping instructions, etc...?

  • When are you looking to have this unit installed and ready for use? Are there any other details about the project that should be considered? Is this part of a construction or renovation project?

  • Do you need a table or cabinet and if so, do you require any special features such as a shelf, extension, etc.? Would you prefer 304 or 316 SS or mild steel? What working height would you like, lift (adjustable height) or fixed height?

  • Are there any additional notes or information that should be considered? Are there any special design requirements?

  • Upload file

  • Service Request Options

  • Surrogate Powder Factory Acceptance Testing

  • Site Acceptance Testing

  • IQOQ (Installation Operation Qualification)

  • On-Site Installation

  • System Mock-up

  • Flat Pack Required

  • Cleaning Protocol

  • Turnover Package

  • Engineering Consultation

  • Please wait